{"city":"Paris","name":"EDF","slug":"edf","facts":[{"date":"2026-05-30","type":"deployment","value":"400","source":"edf.fr"},{"date":"2026-05-30","type":"deployment","value":"EDF selected SoftBank Group as preferred bidder for the design, construction and operation of a large-scale 400 MW data center at EDF’s Bouchain site.","source":"edf.fr"},{"date":"2026-05-28","type":"partnership","value":"5","source":"edf.fr"},{"date":"2026-05-28","type":"partnership","value":"EDF and Mistral AI signed a five-year partnership to develop and deploy AI tools for EDF’s nuclear engineering, maintenance and construction activities.","source":"edf.fr"},{"date":"2026-05-21","type":"partnership","value":"EDF joined the AION consortium with Ardian, Artefact, Bull, Capgemini, iliad, Orange and Scaleway to bid for a European AI Gigafactory in France.","source":"edf.fr"},{"date":"2026-05-21","type":"partnership","value":"EDF joined the AION consortium with Ardian, Artefact, Bull, Capgemini, iliad, Orange and Scaleway to bid for a European AI Gigafactory in France, contributing computing capacity, AI-optimized hardware, software and data-science capabilities.","source":"edf.fr"}],"peers":[],"stage":"state-owned","state":"Île-de-France","aliases":[],"country":"France","domains":[{"why":"EDF generates nuclear electricity and signed a 12-year contract to allocate 40 MW of nuclear production to Data4’s French data centers, with deliveries planned from 2026.","list":null,"rank":null,"tier":"watchlist","layer":null,"total":51,"domain":"AI Core","scores":{"gate_ne":["firepower"],"leverage":7,"position":5,"progress":8,"firepower":1,"commercial":10,"deployment":4,"production":10,"technology":3},"edition":null,"segment":null}],"founded":null,"signals":[{"date":"2026-07-08","header":"Vsora joined the AION consortium pursuing a bid under the European Union’s AI Gigafactories initiative.","outlet":"Electronics Weekly"},{"date":"2026-06-24","header":"AION consortium launched France’s bid for a European AI Gigafactory.","outlet":"Scaleway"},{"date":"2026-06-03","header":"EDF is testing quantum-computing workloads on real machines without a current practical advantage.","outlet":"Maddyness"},{"date":"2026-06-03","header":"EDF and the CNRS are evaluating the energy consumption of quantum algorithms through the Quantum Energy Initiative.","outlet":"Maddyness"},{"date":"2026-06-01","header":"Yxir’s AI quality-management system generates more than half of its revenue outside EDF.","outlet":"Maddyness"},{"date":"2026-06-01","header":"SoftBank Group is partnering with EDF on an AI data center site in Bouchain, France.","outlet":"The AI Insider"}],"website":"https://www.edf.fr/en","category":"AI Infra · Power, cooling & thermal","categories":[{"name":"Generation for data centers","domain":"AI Core","parent":"AI Infra · Power, cooling & thermal"}],"last_round":null,"updated_at":"2026-10-04T14:14:56.208305+00:00","facts_total":18,"positioning":"","sub_category":"Generation for data centers","signals_total":8,"url":"https://www.frontiertechintelligence.com/companies/edf","title":"EDF · ai core, Paris, Île-de-France, France · scores, facts and signals · Frontier Tech Intelligence","description":"EDF generates nuclear electricity and signed a 12-year contract to allocate 40 MW of nuclear production to Data4’s French data centers, with deliveries planned from 2026. AI Core watchlist (score 51) 8 signals and 18 facts with sources.","publisher":"Frontier Tech Intelligence (Future Frontiers, a trade name of Essential Cognition Inc.)","note":"Assessment by Frontier Tech Intelligence; facts and signals carry their sources."}