Kairos Power develops advanced nuclear reactors and will sell power from its Hermes 2 reactor to TVA, with clean-energy credits to Google, a supply relevant to data centers.
The most advanced US Gen IV reactor developer by construction status: Hermes 2 (50 MWe, fluoride-salt-cooled) under construction at Oak Ridge since April 2026 under the first US utility PPA for an advanced reactor (TVA), the first deployment of its 500 MW-by-2035 agreement with Google.
17 signals name Kairos Power. Members see all of them, filtered by topic, source and date.
8 facts on file. Members see all of them with the source link.
Traction: deployment, production, commercials, progress. Capability: technology, positioning, firepower, leverage.
Kairos Power develops advanced nuclear reactors and will sell power from its Hermes 2 reactor to TVA, with clean-energy credits to Google, a supply relevant to data centers. The most advanced US Gen IV reactor developer by construction status: Hermes 2 (50 MWe, fluoride-salt-cooled) under construction at Oak Ridge since April 2026 under the first US utility PPA for an advanced reactor (TVA), the first deployment of its 500 MW-by-2035 agreement with Google.
Kairos Power is on the AI Core watchlist list of Frontier Tech Intelligence with a score of 70 out of 100, below the Top 100.
Kairos Power is based in Alameda, California, United States.
Subscribers see the full file, every signal, the live ranking and the questions the signals answer: where money moved, who controls the layer, where supply is constrained. $99 a month, 7-day trial. What Frontier Tech Intelligence is →