Stack Infrastructure ranks 84 on the AI Infra 100 with a score of 85; Pure Data Centres Group ranks 90 with 85. Pure Data Centres Group is ahead on progress. Stack Infrastructure is ahead on commercials. Level on deployment, production, technology, positioning, firepower and leverage. Pure Data Centres Group is based in London, United Kingdom, Stack Infrastructure in Denver, United States. Pure Data Centres Group is named in 2 signals and Stack Infrastructure in 2.

Pure Data Centres Group →

London, England, United Kingdom · AI Core · Data center build & operate / Colocation & wholesale · puredc.com

Pure Data Centres Group develops and operates AI-ready data center campuses, selling wholesale capacity to hyperscalers such as Microsoft.

AI Infra 100 · rank 90 · score 85

Scores, AI Core (of 10)

Deployment10
Production8
Commercials6
Progress10
Technology6
Positioning8
Firepower10
Leverage10

Darker bar: ahead of the other company on that measure.

Positioning

Pure DC is a hyperscale developer across Europe and the Middle East whose Finnish campus is the largest single project in this registry. SJK01 at Seinäjoki spans 370 acres with more than 550 MW of planned IT capacity and over EUR 7.5 billion of total investment, one of Finland's largest ever inward investment projects and the largest by a UK company there. Phase 1 is 110 MW at over EUR 1.5 billion and, critically, already fully leased, with planning permissions, power requirements and the first substation in place, which separates it from the many announced campuses still dependent on customer commitments. Microsoft has reportedly signed as anchor tenant. The design is repeatable 40 MW AI-ready modules with direct-to-chip liquid cooling, closed-loop with zero operational water use and waste heat into the local district heating network, on more than 700 MVA of renewable power. Financing is the strongest signal: over USD 4.2 billion secured in twelve months, including USD 2.7 billion in May 2026 led by SMBC, Allianz Global Investors and ABN AMRO largely against the Dublin and Amsterdam campuses, then EUR 1.3 billion of committed senior debt on 2026-07-21 for SJK01 Phase 1 across five mandated lead arrangers, executed in six weeks. Technology scores 3 because Pure DC is a developer and operator, not a technology owner.

Latest signals

  • Pure DC completed installation of the final transformer at its 90MW Brent Cross data center.Data Center Dynamics
  • Pure DC paused data-center investments amid disruption from the Iran war.MIT Technology Review

2 signals name Pure Data Centres Group.

Facts, with sources

  • More than USD 4.2 billion of financing secured over twelve monthsGlobeNewswire via manilatimes.net and thetechcapital.com
  • SMBC, ABN AMRO, Citi, Societe Generale and Natixis CIB acted as mandated lead arrangers for SJK01 Phase 1 financingGlobeNewswire via manilatimes.net and thetechcapital.com
  • Committed senior debt against SJK01 Phase 1 arranged by SMBC, ABN AMRO, Citi, Societe Generale and Natixis CIBGlobeNewswire via manilatimes.net and thetechcapital.com

12 facts on file.

Stack Infrastructure →

Denver, Colorado, United States · AI Core · Data center build & operate / Colocation & wholesale · stackinfra.com

STACK Infrastructure develops and operates large data center campuses and leases wholesale colocation capacity, and partners with Amazon.

AI Infra 100 · rank 84 · score 85

Scores, AI Core (of 10)

Deployment10
Production8
Commercials10
Progress8
Technology6
Positioning8
Firepower10
Leverage10

Darker bar: ahead of the other company on that measure.

Positioning

Blue Owl-owned (via IPI Partners) global hyperscale developer delivering the 1 GW-plus Stargate campus in Doña Ana County, New Mexico for Oracle, and financing 250 MW Melbourne and Tokyo campuses with multi-billion bank loans.

Latest signals

  • Box explores agent integration via Stack Infrastructure and cloud tags as a form factor for workplace AI.Sequoia Capital
  • Bloom and Oracle expanded their partnership to power Project Jupiter with up to 2.45 GW of fuel cell capacity.Bloom Energy

2 signals name Stack Infrastructure.

Facts, with sources

  • >500mSequoia Capital — 2026-09-15
  • Admin plugin for ChatGPT Work and CodexOpenAI
  • OpenAI IT teamOpenAI

8 facts on file.

More comparisons

Questions this page answers

Pure Data Centres Group or Stack Infrastructure: which is ahead in ai core?

Stack Infrastructure ranks 84 on the AI Infra 100 with a score of 85; Pure Data Centres Group ranks 90 with 85. Pure Data Centres Group is ahead on progress. Stack Infrastructure is ahead on commercials. Level on deployment, production, technology, positioning, firepower and leverage. Pure Data Centres Group is based in London, United Kingdom, Stack Infrastructure in Denver, United States. Pure Data Centres Group is named in 2 signals and Stack Infrastructure in 2.

How do Pure Data Centres Group and Stack Infrastructure compare?

Stack Infrastructure ranks 84 on the AI Infra 100 with a score of 85; Pure Data Centres Group ranks 90 with 85. Pure Data Centres Group is ahead on progress. Stack Infrastructure is ahead on commercials. Level on deployment, production, technology, positioning, firepower and leverage. Pure Data Centres Group is based in London, United Kingdom, Stack Infrastructure in Denver, United States. Pure Data Centres Group is named in 2 signals and Stack Infrastructure in 2. Both company files carry the scores on eight measures, the facts with sources and the latest signals.

Every comparison here comes from the same files members use every day.

Members see every signal and fact behind both companies, the live ranking, the questions the signals answer and the week explained. $99 a month, 7-day trial. What Frontier Tech Intelligence is →

Subscribe · $99 a month